Stairs … Gone!

We ripped out the old set of stairs yesterday which revealed two issues: 1) The old staircase was not very strongly secured, it was just resting on the lintel with a couple of nails preventing it from slipping!  and 2) The pipes to the combi-boiler are a...

Control Room & Corridor

Work continues.  The Control Room is now all boarded, the machine room has been boarded and framed. The hall cupboards that contain the meters have been framed up ready for doors.  Next stage is ripping out the stairs and framing the...

Latest Studio Plans

These are my current thoughts on the studio. The back corners in the Control Room are bass-traps. The back wall will also have quadratic diffusers and some form of trapping (plus a sofa).  The front early reflection points are treated with Slat Resonators. The...

Sunday update

Kris has started to board the front of the Control Room this week.  Today I’ve added the remaining audio cabling and rockwool to the room.  I’ve also sealed the live room walls with Speedline ready for the 12mm drywall and Green...

Control Room – Rockwool

Just finished installing the rockwool in the Control Room area all ready for resilient bar and plaster-boarding tomorrow.  Managed to get all the audio cables to run away from the electricity, except the wall box from the lounge which had to cross one mains cable...